Construction Site Office: Mobile Modular Container UK
Advantage of Cbox detachable construction site office
• Durability: Designed to withstand the demands of the construction site office, ensuring longevity and reliability.
• Efficiency: The office modular setup allows for rapid deployment and use, minimizing project delays.
• Flexibility: Can be quickly set up on various sites, easily catering to different project needs.
• Portability: As a portable office container, it can be easily moved and repositioned as the project evolves.
• Compliance: Meets UK standards for container office spaces, ensuring safety and regulatory adherence.
• Aesthetics: Features like the mobile homes glass container office option provide a modern look and natural lighting.
• Customization: Offers the ability to tailor the space to specific requirements, enhancing the work environment.
• Cost-Effective: Reduces the need for traditional construction, saving time and money on setting up an office modular space.
☞☞☞Click this link to view more office modular videos from CBOX’s YouTube!
Cbox offers high-quality, affordable, and eco-friendly portable office containers and mobile homes glass container office products and services to its customers around the world. Our detachable portable office containers are ideal for people who want to have their own home without the hassle and expense of traditional construction.
Contact us today to find out more about our container house products!
CBOX Project
Container Office: Removable, Expandable, Reusable, 20 Years Life
Type: Flat Pack Prefab Container Office
Application: Container offices in construction sites, office built-in workshops, and low-cost outdoor offices.
Advantages: Short installation time, 1-15 days, depending on the project, a single container office only needs one day to complete the installation.
Cabin Hospital: Fast, Durable, Safe
Type: Flat Pack Prefab Container Cabin Hospital
Application: Responding to a sudden illness that results in the need to isolate patients or expand the hospital.
Advantages: The installation time of the prefab container homes is short, 7-20 days, depending on the project. We have participated in or independently completed 15 makeshift hospital projects, including the famous project Huoshenshan Hospital.
Dormitory: Fast, Fully Furnished, Stable
Type: Flat Pack Portable Container Dormitory
Application: Due to site conditions, or the need to build a dormitory in a short time.
Advantages: Short installation time, 2-15 days, depending on the project. We can provide a variety of supporting facilities, such as beds, air conditioners, tables and so on.
C-BOX Service
Free Design Service: CAD + Effect Drawing
More than 15 designers and engineers, while providing professional advice, can also ensure compliance with customer requirements.
Customized Service: Size, Appearance, Color, Material, etc., Can be customized
According to customer requirements, we can also customize the thickness of steel, appearance color, anti-rust treatment, wall panels, bottom plates, etc.
C-BOX Portable Container Dormitory
Note: All our products can be customized, if you need better configuration or other special requirements, please consult our staff.
Steel: Q235B Stainless Steel, 2.3mm
Q235B has a certain elongation, strength, good toughness, and castability, is easy to punch and weld, and is widely used in the manufacture of general mechanical parts. It is mainly used for welded structural parts with high-quality requirements in construction and bridge engineering.
cbox
Anti-rust: Spray Paint (110 μ/m²) + Galvanized
The anti-corrosion treatment of many suppliers is only made of spray paint, and the density is only 80 μ/m², which may rust in 2-3 years, resulting in a significant reduction in service life.
But we will galvanize first, and then spray 110 μ/m² anti-rust paint, which can usually reach 10 years of anti-rust time. Greatly provides longevity.
Wall + Floor: Choose high-quality fire and moisture-proof materials
Wall panel: rock wool/glass wool color steel plate
Fire rating: Class A
Water-proof rating: Class A
Floor: PVC+glass magnesium board or PVC+cement
It has very good hardness, and it is also a fireproof and Water-proof material
Window and Door: Steel Doors + Aluminium Alloy Window
Steel Doors: Use high-quality stainless steel doors, 10 years without rust
Aluminium Alloy Window: Durable, no rust, easy to install
We have different configuration options, please contact our sales for details.
32,000㎡ Production Base & Over 1200 Staff
Top-5 Prefab Container Homes Suppliers in China
Participated in the construction of Huoshenshan Hospital
C-BOX’s Strength
Certification
Attached below are certification codes for checking:
CE | Cetrification No: HTT190405290L |
ISO9001:20015 | Cetrification No: HG19Q0058R0M |
Utility Patent | Utility Patent No: ZL 2015 2 0608859.0 |
Alibaba Verified | Verified Type: Multispecialty Supplier |
About CBOX
32,000 M² PRODUCTION BASE & OVER 1200 STAFFS
We are the first and only prefab house supplier using a fully automatic production line in China
Guangdong Cbox Co., Ltd, which covers 350,000 square meters and has an annual output of 200,000 containers (500+ sets per day), focuses on designing and developing, producing, selling, installing, operating, and serving as a whole, providing one-stop box rental and manufacturing for customers.
After 17 years of hard work by the company’s core team, it has obtained 46 invention patents and utility model patents. The workshop is equipped with automated robotic arms to reduce labor costs and reduce costs for customers.
Guangdong Cbox Co., Limited has 29 factories, and the product categories produced include flat-pack container houses, detachable container houses, detachable flat pack container houses, foldable container houses, slide folding container houses, portable toilets, etc.
We take the need of a customer as the base, green safe, economical, and comfortable living experience as the root and development of the industry as the purpose.
With the support of automatic manipulators and excellent sales engineers, CBOX is confident that we can meet the requirements of customers on quality, quantity, and even technical guidance.
FAQ
1. How much manpower and time does it take to install the container homes?
2 hours + 4 workers=1 unit
2. What tools and equipment do I need to prepare for the installation of the container?
Crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife, hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, spirit level.
3. How many days is your fastest lead time?
This depends on the quantity. If it is a regular size, our lead time is generally 7-15 days after receiving the deposit
4. Can you customize colors?
Cbox is happy to accept color customization. The regular color of our boxes is white, which is popular and well-received by customers all over the world. You can also provide the color card number for our reference. What color do you like?
5. What is the largest size that can be made?
The maximum can be 4m*8m, and the 8m surface is equipped with wind-resistant columns to support the top and bottom beams. What kind of functions and requirements are you based on?
6. What is your payment method?
Our payment method is generally TT (wire transfer), 30% deposit, and the remaining 70% paid before shipment.
7. Does your product leak water?
There are quite a number of domestic manufacturers, due to a lack of professionalism and irresponsibility for quality, which leads to the problem of water leakage in the box.
So far, our company(CBOX) has never experienced water leakage problems in overseas orders.
8. Do you need a foundation?
If the land will not subside, there is basically no need to lay foundations. According to different geological conditions, our company will provide guidance and suggestions. If you buy a container from us, we will give you complete foundation drawings and we will have video instructions for installation.
9. Can I add an extra roof, please?
Roofs can be added, and we can send you some pictures of roofing cases we have done before for your selection and reference. Do you want to add a roof based on wind resistance requirements, thermal insulation requirements, or aesthetic requirements?
10. How is your container house insulated?
Wall panels are made of 50mm rock wool sandwich panels, and can be upgraded to 75mm and 100mm thickness, which is better for extreme cold and hot weather
11. Can the floor be covered with insulation?
Yes, no problem.